Bridgeforge

All games

How to forge a bridge

Choose a left-bank idea, a meaningful shared span and a right-bank idea. Use the supplied scenes to decide where each belongs. A scene unrelated to both is unstable.

The two bank supports must together meet the span’s load, and the total cost must fit the plan budget. These numbers are authored game constraints, not measured semantic strength. You may test three distinct complete plans. An incomplete or repeated plan costs no attempt. Any valid construction succeeds; matching the cheapest valid cost earns an efficient forge.

Reveal ends unscored. There can be several successful plans, with different tradeoffs.

    Available materials

    Try another puzzle

    Daily changes at 00:00 UTC. This authored collection repeats 8 daily puzzles and has 4 separate practice puzzles. The saved-progress notice shows whether this browser or the server is keeping your progress.